施工要点

网址:gangbans.aou1.cn  2021-06-15  作者:admin    阅读:

施工要点
Key points of construction
1.施工前,应根据设计和本规程要求以及相关的技术标准编制针对工程项目的节能保温专项施工方案,并应对施工人员进行技术交底和专业技术培训。
1. Before the construction, the special construction scheme for energy conservation and thermal insulation of the project shall be prepared according to the requirements of the design, this specification and relevant technical standards, and the technical disclosure and professional technical training shall be carried out for the construction personnel.
2.岩棉板外保温系统用于节能保温工程的施工应按照经审查合格的施工图设计文件和经审批通过的用于工程项目的节能保温专项施工方案进行。
2. The construction of rock wool board external thermal insulation system for energy-saving and thermal insulation project shall be carried out in accordance with the approved construction drawing design documents and the approved special construction scheme for energy-saving and thermal insulation project.
3.岩棉板外保温系统的生产企业应有专业人员在施工过程中进行现场指导,并配合施工单位和现场监理做好施工质量控制工作。
3. The production enterprise of rock wool board external insulation system should have professional personnel to provide on-site guidance in the construction process, and cooperate with the construction unit and on-site supervision to do a good job in the construction quality control.
4.材料进场必须按规格,数量和质流水槽钢模具 不锈钢铸件 扭王字块模具 井盖钢模具 标志桩模具 调匝式消弧线圈 风冷控制柜 烤漆龙骨
量要求经过验收合格才能入库,并应有专人保管,严禁露天堆放。幕墙岩棉板应架空防潮堆放。
4. The materials must be accepted according to the specification, quantity and quality requirements before entering the warehouse, and should be kept by a special person. It is strictly forbidden to stack in the open air. Rock wool board of curtain wall shall be stacked overhead to prevent moisture.